Hanoi Rental Areas

Which Hanoi Bridges Allow Motorbikes? Red River Crossings by Scooter

Which Hanoi bridges allow motorbikes? Dated traffic notices show motorbike access on Long Bien, Chuong Duong, Nhat Tan, Thanh Tri, Thang Long and Vinh Tuy bridges, with separate lanes or rules on each. For Vinh Tuy, Hanoi’s transport department announced a motorbike/mixed-traffic lane on both bridge spans on 18 October 2023, as reported by VietnamPlus; check current signs before entering. Lane layouts and repair works change with little warning, so this guide names each source and its date. If a posted sign disagrees with this page, follow the sign.

This guide is for riders crossing the Red River on a rented scooter. For the wider picture, start with our Hanoi motorbike rental guide.

Why bridge choice matters on a rental scooter

Only a handful of bridges cross the Red River in Hanoi, and each has its own layout. Some give motorbikes a separate lane, and the main carriageway beyond Nhat Tan is closed to them. A wrong approach on a rented scooter costs a fine, not just a detour.

Expressway sections and their fines

Entering an expressway on a motorbike is penalized under Decree 168/2024/ND-CP, as amended by Decree 238/2026/ND-CP (Article 7): 4 to 6 million VND plus 6 points, or 10 to 14 million VND plus 10 points if it causes a crash. The same article fines stopping or parking on a bridge 600,000 to 800,000 VND. See our guide to motorbike fines under Decree 168.

Navigation apps and car routes

A map app set to car mode may route you onto roads motorbikes cannot use, such as the car-only road beyond Nhat Tan Bridge (covered below). Use motorbike mode if your app has one, check each approach, and see our tips on navigating Hanoi on a scooter. A sign outranks the screen.

Hanoi’s Red River bridges at a glance

The table shows what the sources we checked say about each crossing. A bridge with no recent notice is not necessarily unchanged.

BridgeWhat the sources showKey source
Long BienSide roads for motorbikes beside the railway; reopened 0:00 on 28 May 2026 after a two-month repair closureChinhphu.vn, 27 May 2026
Chuong DuongCarries motorbikes; the diversion route when Long Bien closed; busy at rush hourTuoi Tre News, 26 Mar 2026
Vinh TuyHanoi transport department’s 18 Oct 2023 scheme: one 4.8 m mixed motorbike/non-motorized lane by right railing on each bridge span, 40 km/h; verify current signsVietnamPlus, 18 Oct 2023; verify current signage
Thanh TriThree car lanes, one motorbike lane behind a divider; repair works announced in October 2026Xe.Today, 2 Oct 2026
Nhat TanThree car lanes, one mixed motorbike and bicycle lane behind a steel barrierVietnam.vn, 27 Sep 2026
Thang LongLower deck for motorbikes, bicycles and trains; upper deck for cars and trucks; night works in OctoberVGP News, 7 Jan 2021; Dang Cong San, 27 Oct 2026
Seven new bridgesUnder construction for 2027; no rules yetVietnamPlus, 2 Oct 2026

Notices arrive only days ahead: the Long Bien closure was announced on 26 March for a start on 28 March. Check again the day before you ride.

Central crossings between the Old Quarter and Long Bien

Long Bien Bridge

Can motorbikes cross Long Bien Bridge? Yes, while its side lanes are open, and they have been since 0:00 on 28 May 2026. Tuoi Tre News reported on 26 March that Hanoi would ban motorcycles and pedestrians for 60 days, from 28 March to 27 May, for urgent repairs; Chinhphu.vn then reported that motorbikes, non-motorized vehicles and pedestrians could use the bridge again in both directions.

It was not the first interruption. From 1 November to 31 December 2025, riders were barred in the direction from Bo De Ward to Hoan Kiem Ward and sent over Chuong Duong (VNA, 12 November 2025). We found no newer notice, but silence is not a promise: look for barriers and signs at the approach, keep Chuong Duong as your fallback, and ride slowly, because people on foot use the bridge too.

Chuong Duong Bridge

Chuong Duong is the practical crossing between central Hanoi and Nguyen Van Cu Road, and the bridge that absorbs riders whenever Long Bien closes. The March 2026 notice diverted motorcycles onto roads connecting to Chuong Duong, including Long Bien-Xuan Quan, Tran Nhat Duat and Tran Quang Khai, and allowed bicycles in its mixed-traffic lane (Tuoi Tre News). We found no official lane diagram, so follow the markings.

Traffic is the main issue. While Long Bien was partly closed in November 2025, VNA reported the worst periods as 6:30 to 8:00 and 17:00 to 18:30, with queues stretching for kilometers on the approach roads. Cross outside those windows if you can.

Southern crossings

Vinh Tuy Bridge

A specific dated traffic plan exists: VietnamPlus reported Hanoi’s transport department’s 18 October 2023 scheme. Vinh Tuy 2 runs from Hai Ba Trung toward Long Bien; Vinh Tuy 1 runs in the reverse direction. Each span has a separate 4.8 m mixed motorbike/non-motorized lane along the right railing, with a published 40 km/h limit. This documents the 2023 scheme, not a promise that no later temporary changes apply. A VnExpress International photo story of 14 September 2026 shows commuters pushing stalled bikes through knee-deep floodwater at the foot of the bridge. Check the lane signs, and avoid the bridge foot after heavy rain.

Thanh Tri Bridge

Thanh Tri was reorganized in October 2022 into three car lanes and one separate motorbike lane behind a rigid divider (Dan Tri, 20 January 2026). The same article reported cars crossing into the motorbike lane, and one reader asked for wind-screen netting on the railing to steady handlebars.

Repairs followed. Xe.Today reported on 2 October 2026 that work on spans, bearings and expansion joints would take nearly three months, with speeds in the work zone cut to 40 km/h or less and work mainly from 21:00 to 05:00. If works narrow the motorbike lane, part of a car lane is given to motorbikes. Follow the cones and signs.

Northern crossings

Nhat Tan Bridge

Are motorbikes allowed on Nhat Tan Bridge? Yes, in a lane of their own. Tuoi Tre News reported on 17 September 2025 that an 80-centimeter steel barrier now separates three car lanes from one exclusive motorbike lane, and that police planned to enforce lane violations from 1 October. You cannot cross the barrier, so choose your lane before the bridge begins.

A six-month pilot runs from 27 September 2026 to 27 March 2027. Vietnam.vn, republishing Tien Phong, reports 80 km/h in the car lanes and 40 km/h in the mixed lane for motorbikes and bicycles.

North of the river, Vo Nguyen Giap Road toward Noi Bai Airport is built for cars. VOV Giao thong reported in November 2024 that its main carriageway is closed to motorcycles, mopeds, electric bicycles, non-motorized vehicles and pedestrians, with collector roads on both sides for motorbikes. Use the collector roads and never follow a car route straight on. Arriving by air? See our airport guide to scooter rental with a transfer first.

Thang Long Bridge

Thang Long has two levels. A January 2021 Vietnam Government News report describes cars and trucks on the upper deck and motorbikes, bicycles and trains on the lower deck, and adds that cars could also use the lower deck, so expect mixed traffic below.

October 2026 brought night works at the north end. A notice reported on 19 October set half-road barricades in each direction from 22:00 to 05:00 between 22 October and 15 December, and on 27 October Dang Cong San reported that full traffic was expected from 22:00 on 29 October, with some lane-by-lane night work continuing. None of the notices mentions motorbikes, so check barriers and signs after dark.

Reading the signs at a bridge approach

Vietnam’s national road-sign regulation, QCVN 41:2024/BGTVT, which replaced the 2019 edition, defines the signs at a bridge approach.

No-motorbike and no-entry signs

Prohibition signs: P.104 bans motorcycles, P.105 bans cars and motorcycles, P.111a bans mopeds (xe gắn máy), P.102 means no entry, P.101 means road closed and P.130 prohibits stopping and parking. Instruction signs: R.403e marks a road for motorbikes, R.403f a road for motorbikes and bicycles, R.412d a lane for motorbikes, R.412g a lane for motorbikes and bicycles and R.412f a lane for cars. If you are unsure a sign applies to your scooter, do not enter.

Expressway entrance signs

Expressways have their own signs: W.238 warns that an expressway is ahead, IE.451 marks an entrance, IE.452 the start of the expressway and I.437 the expressway itself. Seeing them means you are about to enter a road motorbikes may not use.

What to do if you miss the motorbike lane

Do not stop, reverse, turn around or try to cross a barrier. Keep a steady speed, stay clear of fast traffic and leave at the first place the signs allow, then re-plan from there. The same applies if you realize you have entered an expressway.

Crossing safely: lanes, wind and no parking

  • Stay in your lane. Barriers on Nhat Tan and Thanh Tri leave no choice, so decide before the bridge.
  • Hold the bars. Open spans catch crosswinds, and a passing truck adds to them, so keep both hands on the handlebars.
  • Never stop on the bridge. Stopping or parking is fined 600,000 to 800,000 VND, so take photos from a legal place away from it.
  • Time your crossing. Avoid Chuong Duong at 6:30 to 8:00 and 17:00 to 18:30, and skip flooded approaches after heavy rain.

Crossing to HANOI MOTO in Bo De Ward

HANOI MOTO is at 114 Nguyen Van Cu, Bo De Ward (the former Long Bien District), on the east bank; see the locations page. It is open from 09:00 to 21:00 daily, with handover by appointment. From central Hanoi, Chuong Duong is the natural crossing because Nguyen Van Cu Road continues from its eastern end; our route guide to Bo De Ward covers the approach. Long Bien is the alternative while open.

If your ride starts or ends in the Old Quarter, check our low emission zone guide. Phase one runs to 31 December 2026, and Zone 1 bars all motor vehicles from 19:00 to 24:00 on Fridays, Saturdays and Sundays.

Planning a pickup or return at HANOI MOTO in Bo De Ward? Confirm your appointment through our contact page, on Zalo at +84 857 255 868 or by email at motoopen12@gmail.com, and plan your river crossing with this guide before you ride.

Frequently asked questions

Can I ride a scooter across Long Bien Bridge?

Yes, while its side lanes are open. Motorbikes were allowed back from 0:00 on 28 May 2026 after a two-month closure, and we found no newer notice. It has had two repair closures since November 2025, so check the approach, and use Chuong Duong if Long Bien is shut.

Are motorbikes allowed on Nhat Tan Bridge?

Yes, in a separate lane: three car lanes and one for motorbikes and bicycles behind a steel barrier, with a 40 km/h limit in that lane during a pilot that runs to 27 March 2027. The main carriageway of Vo Nguyen Giap Road beyond the bridge is closed to motorbikes.

Can I stop on a bridge to take photos?

No. Stopping or parking on a bridge carries a fine of 600,000 to 800,000 VND under Decree 168/2024/ND-CP, as amended by Decree 238/2026/ND-CP (Article 7). Take photos where stopping is allowed, away from the bridge.

What happens if I ride onto an expressway by mistake?

Entering an expressway on a motorbike is fined 4 to 6 million VND plus 6 points, or 10 to 14 million VND plus 10 points if it causes a crash (same decree, Article 7). Do not stop or reverse: keep a steady speed, leave at the first exit and re-plan.

Which bridge is most practical for reaching Bo De Ward?

Usually Chuong Duong, because Nguyen Van Cu Road continues from its eastern end. Long Bien is the alternative while open. Avoid 6:30 to 8:00 and 17:00 to 18:30 if you can.

Sources and last checked

Last checked on 2 November 2026. Titles of Vietnamese-language sources are translated.

Keep reading

Related guides

Conversation

Leave a Reply

Your email address will not be published. Required fields are marked *